Supply and Installation of Wastewater Treatment Plant (Hydraulic load of 440 m3/day) at Nam Thang Long Urban Area
                             18/09/2021
                        
                                                                        Location: Ciputra urban area - Nam Thang Long, Hanoi city. The produced effluent meets standard QCVN 14:2008/BTNMT. Investor: Phuc Hung Holdings Joint Stock Company. Treatment hydraulic load: 440m3/day.
| Item | Supply and installation of wastewater treatment plant with hydraulic load of 440m3/day | 
| Location | Ciputra Urban Area - Nam Thang Long, Hanoi City | 
| Effluent standard: | 
			 QCVN 14:2008/BTNMT  | 
		
| Investor: | Phuc Hung Holdings Joint Stock Company | 
| Hydraulic load | 
			 440 m3  | 
		
Video: Sampling wastewater at IA20 project - Ciputra Nam Thang Long urban area
Hình ảnh: Produced effluent’s quality is verified compliant with column A, QCVN 14:2008/BTNMT
                                

                                    
                                    
                                    
                                    
main.comment_read_more